PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued constructing metal racks for the electrical equipment at the 4th floor.jpg Continued installing ductwork at the 2nd floor Facing East.jpg Installed steal beams at the 4th floor East Elevation.jpg Started excavating Boiler Room for the underground electrical roughing Facing South-East.jpg Started installing ductwork at the 3rd floor Facing West.jpg Welded metal clips along column H-1 Facing East.jpg
Previous pageNext page Started installing ductwork at the 3rd floor Facing West
Started installing ductwork at the 3rd floor Facing West